If you have all the materials the process shouldn t take more than 2 hours depending on the size of your shed.
Creating a level base for a shed.
You can leave the four pegs in position or remove later when your shed is erected.
Grab your favorite shovel it s that time again grab your gloves and favorite shovel.
Use a garden rake to level the stone to your four reference points.
Now that you ve chosen a location for your shed you re ready for step 2.
Dig a hole to a depth of at least 6 inches.
Strip the topsoil and dig out to a depth of approx.
Dig level off and rake the area.
Need help leveling the ground for a shed.
How to build a slab shed base 1.
An easy shed foundation for the beginner and good for prebuilt or a home built sheds.
How to level the ground for a shed step 1.
Digging out the hole correctly is a vital stage in creating a shed base.
All are ideal to prevent water collecting around the shed floor and damaging it.
On a level piece of ground mark out the corners of your gravel shed foundation allowing for at least 12 inches on each side.
The bigger the paver the heavier it is but the fewer you need.
Adjust the grade of the pad accordingly until it is level in all directions.
There are a number of different options to create the necessary flat and level surface and we re going to take you through four of them.
Leveling the ground is important for any storage building as it will help keep.
Insert a pencil at each side of the hole 6 inches down and remove any surplus soil that sits above the string until the base is level.
These four methods are how to lay.
A foundation of pavers sits on leveled exposed ground or a sand base.
Decide where you will be placing your garden shed leaving enough space from hedges fences and.
Then attach a piece of string to two pencils to find out if your excavated base if level.
Screed and tamp the stone to exactly the top of the four reference points.
To fine tune the level use a piece of 2 4 lumber.
Square and stake the corners.
Here are 9 points to consider when choosing an ideal portable building location.
They provide a solid flat base upon which to build or set a shed and evenly support the floor.
Thus if you have an 8 x 10 shed your stakes should be set to create a space that measures 10 x 12 feet.
Place the string level on the midpoint of each length of string to see if each section is level.
Mark our your base.
Now you have a level base to place your shed on.
A timber base also known as a portabase a plastic base.
Choose a shed location.